Roadmap
The Econovetech roadmap organises the move from public website recovery into working B2B flows, University content, avatar access, Web4 Lab integration and controlled monetisation.
Phase 1: Public Site Stabilisation
Finish the homepage, documents, hubs, products, B2B, University, AI Avatar and Access routes so the public site is clear and professional.
Phase 2: Internal Request Flows
Replace Outlook-triggering links with internal request pages, then connect proper backend form submission when the endpoint is ready.
Phase 3: Avatar Interface
Route AI Avatar buttons to a proper on-site avatar gateway or chat interface, not to email or Outlook.
Phase 4: Web4 Lab
Add Web4 Lab, Games and Chess3 sections, link to the public test build, and preserve Chess3 safety locks.
Phase 5: Monetisation Design
Prepare Stripe, Coinbase or payment architecture where appropriate, without enabling Chess3 payments, tournaments or public result pushing before approval.